Advanced Search

Evanston RoundTable | Evanston, IL
animal shelter, thank you


home : city news : city news May 3, 2016

6/3/2013 11:39:00 AM
City Parking Lot on Central St. to be Rehabbed in June
Submitted by the City of Evanston


 

Starting the week of June 3 for five weeks, the City of Evanston will be contracting out work on the city parking lot rehabilitation project at Central St. and Stewart Ave. The project involves installation of storm drainage system and reconstruction of the parking lot. As part of this project, sidewalk bump-outs will be constructed on Central St. at Stewart Ave. This bump-out should improve safety for pedestrians crossing Central St. Also, the sidewalks on Central St. and Stewart Ave. around the parking lot are being replaced with porous concrete. A bike shelter will be installed on Stewart St. north of Central St. in the west parkway.

Street sweeping and/or neighborhood parking restrictions will be waived for a one-block radius around the construction zone when temporary daytime “NO PARKING” is in effect. The construction activities will create some inconvenience for abutting businesses and residents, but we will attempt to minimize these problems.

Street and Driveway Access – Traffic will be maintained on Central St. during construction with one travel lane in each direction at all times. Notification will be provided to the businesses in advance of any sidewalk removal and replacement on the south side of Central St.

Parking – Construction zone daytime “NO PARKING” restrictions will be intermittent on Central St. between Stewart Ave. and Hartrey Ave. during construction; evening and night time parking (5 p.m.-7 a.m.) will be available on the street. We kindly ask that businesses/residents use legal street parking spaces on adjacent side streets for your parking needs.

CONTRACTOR
The contractor for this street improvement program is Chicagoland Paving Contractor Inc., 225 Telser Road, Lake Zurich IL 60047.

CITY SUPERVISION
The project is under the supervision of the City of Evanston’s Infrastructure & Engineering Division. The Resident Engineer in the field will be Brian Frank, who will be directly responsible for all aspects of the construction. If businesses/residents have any questions or concerns, they can contact the Resident Engineer at 3-1-1. General questions about parking lot projects should be directed to Sat Nagar, P.E., Senior Engineer at 3-1-1.

 







Article Comment Submission Form

The RoundTable welcomes your comments. We will try to post comments within a few hours, but there may be a longer delay at times. Comments containing mean-spirited, libelous or ad hominem attacks will not be posted.

Note: Your full name is required. Your telephone number and e-mail will not be posted. You may type your comments in the space below, or you may type them in a word document and cut and paste them in the space below.

Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   



Click to View Upcoming Events
<May>
SMTWTFS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        
Submit Event







HomeVideosCommunity PostsObituariesClassifiedsAdvertiseAbout UsContact UsHow To
animal shelter, thank you

Copyright 2008-15 - Evanston RoundTable LLC, Evanston, IL 60202, 847-864-7741, All Rights Reserved
Software © 1998-2016 1up! Software, All Rights Reserved


: